City hosts ribbon-cutting ceremonies for River Road reopening and Lance Place Playground project completion

The City of Reading hosted two ribbon-cutting ceremonies Friday morning. The first was to celebrate the completion of the Lance Place Playground renovation project, and the second was the opening of the River Road extension.

The Lance Place Playground, while a small 60’x 90’ lot, serves a vital role in the community. The project entailed relocating play equipment from 6th and Amity, installing curbing and play surfaces, replacing asphalt with grass, revitalizing existing play equipment, and replacing existing fencing.

- Advertisement -

Lance Place Playground is located at 759 Lance Place. The renovation was done by Uhrig Construction Inc. at a cost of $179.163 funded by the Capital Improvement Project.

The River Road Extension Project is designed to improve access to the city for commercial vehicles by extending Lincoln Street from West Windsor to West Spring. The new roadway will provide truck traffic with a safer and more efficient route to and from Schuylkill Avenue /Route 183.

- Advertisement -
Berks Weekly
Berks Weekly
Berks Weekly is an independent and locally owned digital newspaper covering the City of Reading and Berks County. Subscribe today: berksweekly.com/subscribe
Reading
broken clouds
44.6 ° F
51.2 °
40 °
74 %
0.6mph
76 %
Tue
58 °
Wed
58 °
Thu
43 °
Fri
49 °
Sat
42 °

Latest News

34,088FansLike
91,050FollowersFollow
1,980SubscribersSubscribe