PennDot has announced a revised schedule for the road work on Greshville Road in Douglass Township. Originally scheduled to begin June 24th, the road work will be begin July 8th, 2019.
Greshville Road will now be be closed and detoured for repairs to the bridge over Ironstone Creek until September 6th, 2019.
Passenger vehicle traffic will be detoured on PA 562 and Farmington Avenue. Truck traffic will be detoured on PA 562, PA 73, PA 100 and Farmington Avenue.
Allow for extra time traveling through the area. Work includes deck repairs, substructure repairs, and slope repairs. The work being done by a PennDOT Contractor.